Well, a project progress report, seeing that one of the semi-big projects on my list of home-improvement items has been accomplished – and bountifully, at that. Well, it did run to about $300 more in labor and $200 more in stuff – specifically a wall-mounted mirror, a faucet set, and a glass shelf – than I had initially anticipated. But the small bathroom renovation is complete and gorgeous! Well, once the glass shelf arrives, courtesy of Amazon and UPS, it will be complete. I began working on the bathroom after I got back from Houston, at the middle of April – scraping disgusting wads of soluble plaster and popcorn texture off the ceiling, and alternately, those last bits of paint from off the concrete floor, while awaiting the convenience of Neighborhood Handy Guy. Neighborhood Handy Guy boogies to the beat of a different drummer, when it comes to a schedule, I’m afraid. When he says, “I’ll be over first thing!†it could mean anywhere between 8:30 and noon. When he says, “I’ll be over today!†it could be any time from mid-morning to late afternoon. This charming eccentricity is forgiven by neighborhood clients because he does amazingly good work (carpentry, tile-work, fixture-installation, painting, etc.) being a perfectionist at heart, and that his charges for labor are … well, let’s just say they are reasonable. Especially if you do some of the work, assist him, and purchase the necessary. So reasonable that he is in constant demand – another reason for being patient. So – two weeks of work from Neighborhood Handy Guy, including trips to the local Lowe’s outlet, first to pick up the pedestal sink and the new toilet, the paint, tile for floor and sink surround, good sturdy planks for a shelving unit, baseboards and trim, subsequently to collect other items as required … and now the bathroom is finished. Yay! (Pictures below. The room is so small that it’s impossible to back up far enough to take pictures encompassing the whole … and the paint color is more of a white with a pink tinge than the sort of Pepto Bismol shade that it looks under flash.)
It’s amazing how much roomier it seems, now with a nice pedestal sink, and with a custom, if simple and unadorned shelving unit installed. The original vanity was contractor-grade, and so shoddy that I bashed it apart myself with an ordinary hammer and consigned it to the gargantuan wheelie-trash-bin without any untoward exertion. And my place was built by a reputable company: homes built by the really fly-by-night builders must be equipped with cabinets built with heavy cardboard, and fixtures constructed from soda straws and heavy tinfoil.
It’s only the very first item on my Five-Year To-Do, though. I am awaiting the call from the roofing and remodeling company, in service to the second item – initial construction of the Catio and in association with that project, a new roof. Sometime in late May, early June, I think. Then the garage door – and that is dependent on sorting out all the crap in the garage, much of which is the Daughter Unit’s. She came home from her last station at Cherry Point and when her hold baggage arrived, it was all unloaded into the garage. The master bath reno must wait until after Christmas. Sigh. Another week of scraping popcorn gunk off the ceiling awaits me at that point. And likely at least three weeks of waiting every day for Neighborhood Handy Guy to appear and work his home-renovation magic. Until then, I solace myself by going down the hall, opening the door, and basking in the retro-charm of the finished small bathroom.
Congratulations! You are making progress. Since you have mastered the key concept of doing what you can yourself and paying for the skilled labor to see that what you can’t do is done right you are on the right track.